Subject: HVAC systems
RE: Mary Reinsch Sackett on HVAC: Most systems require a year of operation to reveal flaws in design, equipment or installation. This usually corresponds to a full cycle of weather conditions. Once the system is stabilized, the building should stabilize in about 3 months. If the HVAC was installed without accompanying vapor and thermal barriers, it is possible that the building will never stabilize. Close monitoring and frequent maintenance will help avoid surprises and crises from the HVAC system. After about 3 years of operation, a good maintenance program is mandatory, as the equipment is no longer "new". Geoffrey Brown Curator of Conservation Kelsey Museum University of Michigan 313-747-0439 *** Conservation DistList Instance 8:78 Distributed: Thursday, March 23, 1995 Message Id: cdl-8-78-005 ***Received on Thursday, 23 March, 1995